Wagstaff Piling

Wagstaff Piling is a specialist foundation engineering contractor.

Wagstaff Piling was formed by John Wagstaff in 1980 and since this date has successfully completed over 5900 projects encompassing all types of foundations in a variety of ground conditions for a wide range of civil engineering and building applications.

Wagstaff Piling is a wholly Australian owned enterprise with a vision to provide ongoing professional and technically competent staff at all levels, to offer clients the best foundation system for their site, properly installed at an economic price.

The company operates throughout Australia with the most advanced piling equipment available.

Services

Driven Piling

  • Precast
  • Steel Sections
  • Prestressed
  • Timber
  • Minipiles

Bored Piling

  • Bored Piling
  • Piles under Drilling Fluids
  • Piles with Temporary Segmental asing
  • Permanently Cased Piles

Ground Improvement

  • CSM – Cutter Soil Mixing
  • Stabilised Bridging Layer
  • Rotary Soil Mixed Columns
  • Controlled Modulus Columns
  • Jet Grouting
  • Permeation Grouting
  • Amphibious Access Systems
  • wick Drains
  • Vibrocompaction
  • Stone Columns
  • Lime Columns

Retaining Piles

  • Diaphragm Walls
  • Steel Sheet Piles
  • Concrete Sheet Piles
  • Continuous Piles
  • Secant Piles
  • Cut Off Walls
  • Ground Anchors
  • Vibwalls

Injected Piles

  • Concrete / Grout Injected CFA
  • Concrete / Grout Injected Campiles
  • Front of Wall Injected Piles

Pile Testing

  • Pile Testing with CAPWAP Analysis
  • Static Load Testing
  • Vibration Monitoring
  • Noise Monitoring

Contact Information

E: info@wagstaffpiling.com.au
P: 07 3366 2555
W: www.wagstaffpiling.com.au